Pa Snip Enterprise Log Stardate Feb 15th 2019
Posted: Fri Feb 15, 2019 9:41 am
'Poddington & Snap take over the 'labour' department'
I mentioned on a recent post my transfer from the labour department to the blue collar project planning and finance section
The next project is underway with some components having been delivered to the plot into the care of “Snap Pea” (Poddington’s husband, called Snap Pea because he wants to take over one of my cameras & lenses when I depart)
No doubt he will be ‘assisted’ by their young son “Zip Pea” so named as he tends to zip from place to place at a rate of knots on the plot
Unfortunately, when that particular delivery arrived at the plot, they had sent a lorry too big to drive on site to unload
The driver therefore unloaded by the main gate and left Snap to shift it on his own to the other side of our site
The other depot made a successful delivery of 2 tonnes tote bagged sharp sand direct to plot, much to Snaps relief.
Component parts delivered so far consist of
8 parts x 7.2mt x 150mm x 50mm C24 treated timber
8 parts x 1.2mt x 150mm x 50mm C24 treated timber
36 x 10cm screws
2 tonne sharp sand
Awaiting delivery, due 3 to 4 weeks, 10cu mt. composted manure (approx. 7 tonnes)
Now considered ‘work in progress’
I mentioned on a recent post my transfer from the labour department to the blue collar project planning and finance section
The next project is underway with some components having been delivered to the plot into the care of “Snap Pea” (Poddington’s husband, called Snap Pea because he wants to take over one of my cameras & lenses when I depart)
No doubt he will be ‘assisted’ by their young son “Zip Pea” so named as he tends to zip from place to place at a rate of knots on the plot
Unfortunately, when that particular delivery arrived at the plot, they had sent a lorry too big to drive on site to unload
The driver therefore unloaded by the main gate and left Snap to shift it on his own to the other side of our site
The other depot made a successful delivery of 2 tonnes tote bagged sharp sand direct to plot, much to Snaps relief.
Component parts delivered so far consist of
8 parts x 7.2mt x 150mm x 50mm C24 treated timber
8 parts x 1.2mt x 150mm x 50mm C24 treated timber
36 x 10cm screws
2 tonne sharp sand
Awaiting delivery, due 3 to 4 weeks, 10cu mt. composted manure (approx. 7 tonnes)
Now considered ‘work in progress’